The 2-Minute Rule for Cast in Situ Piles in Bangladesh
As found in the determine down below, continuous auger is used to drill the borehole, raise up drilled soil, and pour concrete while the auger is moved up. Because of this, the borehole isn't going to require casing or hydrostatic tension to forestall harm to the borehole wall.From the Value perspective, they’re a Price-successful alternative w